MBIC Boiler ReplacementThe Department of Interior, Bureau of Land Management (BLM), Montana State -450 boiler. The removal and replacement of the existing flue using Stainless Steel. The exhaust and combustion air venting is to be sized per manufacture recommendations. Connect existing gas line and condensate drain to the new boiler. Supply environmental water treatment to condensate drain. Sample water within the hydronic system and adjust as required to meet the manufacture specification. Perform all manufacture performance testing after the installation of the boiler in the presence of Government personnel. Integrate the new boiler into the proprietary building automation system (Johnson Controls Metasys software), using its graphic controls interface to verify all control and report points; resolve any warnings or alarms in the HVAC system. Confirm or correct hot water pump programming for lead/lag operation and ensure METASYS network control points match those of the new boiler. Testing and balancing (TAB) of the hot water system must be performed by a certified third-party company. The project¿s location is within Chouteau County, Montana.PROCUREMENT OVERVIEWTYPE OF CONTRACT: Construction, Firm Fixed Priced (FFP), Single Award ContractTYPE OF CONSTRUCTION: BuildingNAICS CODE: 238220, Plumbing, Heating, and Air Conditioning ContractorsMAGNITUDE: Between $25,000 and $100,000RESTRICTIONS ON CONTACTS: Beginning upon release of the request for quote (RFQ) through contract award, contacting Government employees who may be associated with this work by participating quoter on the subject of this RFQ is inappropriate. Quoters for this RFQ, including subcontractors and teammates, shall not attempt such contacts during this period. All correspondence shall be through the Contract Specialist listed below:Bureau of Land ManagementAttn: Jorge AlvarezPhone: (854) 500-1840Email: [email protected] SITE VISIT: The Government strongly urges quoters to inspect the site to gain a better understanding of the work
requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award.See Section L, Site Visit (Construction) for more information.
23 June 2026 at 1:00 pm, Mountain Time.
Questions submitted after this date and time will be accepted but may not be answered. All
questions must be submitted in writing via e-mail to Jorge Alvarez. See Section L, Paragraph L.12, Submittal of
Get matched to contracts like this daily
Free AI-powered contract matching for your business.