The Department of Defense is procuring control valves for the Navy, specifically for use in crucial shipboard systems where the integrity of the material is critical to prevent serious personnel injury or loss of vital systems. The procurement requires adherence to special control procedures due to the material's designation as Special Emphasis SUBSAFE/Non-Level I material, ensuring that only correct and defect-free materials are supplied.
Get your fit score, win probability, and required capabilities.
The contractor will provide control valves that are essential for shipboard systems, ensuring compliance with stringent quality and material specifications.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov|4|N743.43|WVU|771-229-0569|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|STAND-ALONE RECEIVING REPORT - CERTIFICATIONS COMBO-RECEIVING REPORT & INVOICE - MATERIALS|N/A|TBD|N00104|TBD|N39040-CERTIFCATIONS|N50286|TBD|136|N/A|N/A|N39040-CERTIFICATIONS|N/A|N/A|SEE DD 1423|PORT_PTNH_WAWF [email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR FROM DATE OF DELIVERY|ONE YEAR FROM DATE OF DELIVERY||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL
REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|NOT TO EXCEED (FIRM FIXED PRICE)| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.Data Item A001 (inspection and Test Plan) may be waived if already on fileatNAVSUP WSS Mech. 2. This is a rated order certified for national defense use,and the Contractorwill follow all the
requirements of the Defense Priorities and AllocationsSystem regulation (15 CFR 700). 3.This is a request for a not to exceed quote subject to downward negotiationsfor the complete repair to include evaluation to completed repair.After awardup on receiving a detailed repair proposal for each individual item(includingrecommended components for repair along with a delivery schedule andinformalcost breakdown), order will be definitized. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as Special Emphasis SUBSAFE/Non-Level I material and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Test/Inspection Certifications - To allow Contractors to use existing stock of material previously tested with NDT specification revisions that are technically acceptable while minimizing the submittal of waivers/deviations, the following test/inspection specification revisions are acceptable in lieu of their preferred current revisions (where applicable) listed under "Document References" below when they were the current revision as of the date of NDT certification. MIL-STD-1949 Original, Revision A, A Chg Not 2 MIL-I-6868 Rev. E, Revision E Amendment 1, Revision E Amendment 2 ASTM-E1417 1999, 2011 SAE-AMS-STD-2154 2005, 2010 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;20405-001 78062 C D; 2.2.4 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | | DOCUMENT REF DATA=MIL-I-6868 | | |E |800606|A| 3| | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-STD-2154 | | |E |210701|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3.
REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;78062, drawing ;20405-001 and Maintenance Standard MS 5560-081-086 Rev C CHG 4, except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package). 3.1.2 The Prime Contractor must be the ;OEM for sole source repair; . 3.1.3 ;This item shall be refurbished in accordance with NAVSEA approved MRO procedure, Sargent Engineering Document 11-000001 Rev. K dated 9/7/17.; 3.2 Contract Support Library - Additional
requirements for this item are identified as Contract Support Library Reference Number ;CSD737; in ECDS at https://register.nslc.navy.mil/ 3.3 A Certificate of Tests is required for non-destructive, hydrostatic, and operational testing as required by the assembly drawing and the maintenance standard, when invoked. Non-destructive testing must be in accordance with T9074-AS-GIB-010/271, MIL-I-6868, ASTM-E1444, ASTM-E1417, or SAE-AMS-STD-2154. 3.4 Certificate of Compliance - (Special Emphasis SUBSAFE/Non-Level I MATERIAL) - The Contractor must prepare and submit a certificate of compliance traceable to each serialized component, certifying that the components furnished under this contract comply with the
Get matched to contracts like this daily
Free AI-powered contract matching for your business.