Closed
Save

Shenango River Lake Water Tank Rehabilitation

Department of Defense (DoD) > U.S. Army > Engineer Division Great Lakes and Ohio River District PittsburghSol: W911WN26BA014
SBFFP
$13K – $150K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Army Corps of Engineers is procuring rehabilitation services for the elevated water tank at Shenango Lake in Pennsylvania. The project includes extensive work such as replacing interior piping, electrical panels, and the access ladder, with a focus on ensuring compliance with safety standards and minimal disruption to nearby recreational areas. The work must be substantially completed by May 15, 2027, to facilitate the summer recreation season.

Generated 31d ago

Scope & Requirements

The project involves the rehabilitation of the elevated water tank, including the replacement of interior piping, concrete slabs, electrical panels, and access ladders, ensuring compliance with safety standards.

Contract Details

Contract Typei
FFP
Contract Value
$13K – $150K per task order
IDIQ ceiling: $45M
Similar contracts award $13K to $150K (median $35K, 3,862 awards)
NAICS Codes
Place of Performance
Transfer, Pennsylvania, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Small Business

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
U.S. Army Corps of Engineers
Office
Engineer Division Great Lakes and Ohio River District Pittsburgh

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 22, 2026
Became Special Notice1mo ago
Jun 22, 2026
Tracked
Became Solicitation1mo ago
Jun 22, 2026
Tracked
Last Updated1mo ago
Jun 24, 2026
Response Due24d ago
Jun 30, 2026
Tank Emptying Periodin 2mo
Oct 1, 2026
Contractor shall empty the tank for the fall 2026/winter 2027 or fall of 2027/2028 off season.
Substantial Completion Datein 10mo
May 15, 2027
All work must be substantially completed by this date.
Tank Refill Date for Summer 2027in 10mo
May 15, 2027
Government will refill the tank on or around this date.
Tank Refill Date for Summer 2028in 2y
May 15, 2028
Government will refill the tank on or around this date.

Description

The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the rehabilitation of the elevated water tank at Shenango Lake, Mercer County, Pennsylvania. The work generally includes the removal and replacement of interior piping and related appurtenances, removal and replacement of interior 6-inch concrete slab and removable grating, removal and replacement of electric panels, and removal and replacement of interior lower ladder. The major features of this requirement are: The removal, disposal, and in-kind replacement of all interior pedestal and tank piping and valves including the risers, overflow, and drain lines along with all heat tracing, insulation, supports, and associated appurtenances. The removal, disposal, and replacement of the interior 6-in concrete slab to allow for their placement of any embedded piping. This includes all fill, steel reinforcement, expansion materials, and appurtenances associated with any penetrations though the concrete slab. The removal, disposal, and in-kind replacement of the removable grating and its associated angles. The removal, disposal, and replacement of the interior electrical panels including Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical panels shall functionally duplicate the existing panels. The removal and disposal of the existing access ladder from the ground level through the insulated ceiling to the first work platform and the replacement with an OSHA approved ladder and safety climbing devices, consisting of flexible cable type system with full body harness. Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to flood mitigation and recreation areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. After coordination and approval by the

Contracting Officer and Government Staff, the Contractor shall empty the tank for the fall 2026/winter 2027 or fall of 2027/2028 off season. The Government will refill the tank on or around May 15, 2027, for the Summer 2027 recreation season and around May 15, 2028, for the Summer 2028 Recreation. All work shall be substantially completed in order to open the recreational area to the public no later May 15, 2027. Substantially complete shall include installation, testing, disinfecting, and acceptance by the Government of all equipment and piping which is in contact with water to allow operation of the water system. This procurement is a 100% Small Business Set-Aside. ponsible Bidders are encouraged to Bid. All Bids must be submitted via the Procurement Integrated Enterprise Environment (PIEE) by the response due date. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?. Mario TAORMINA Alternative

Point of Contact Connie L. Ferguson

Get matched to contracts like this daily

Free AI-powered contract matching for your business.