The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Veterans Affairs is procuring construction services for a new boiler plant at the West Haven VA Medical Center in Connecticut. The project involves constructing a new boiler building, extensive site work, and internal renovations to an existing building, with a firm-fixed-price contract anticipated. The construction is expected to take approximately 720 days and falls within a budget range of $50 million to $100 million.
The project includes the construction of a new boiler building and associated site work at the West Haven VA Medical Center.
This Sources Sought Notice is for market research and information purposes only at this time and shall not be construed as a solicitation or as an obligation on the part of the Department of Veterans Affairs (VA). The Department of Veterans Affairs, Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) is conducting a market survey and is seeking potential sources for the Boiler Plant Replacement Construction Project at the West Haven VA Medical Center located in West Haven, CT. PROJECT DESCRIPTION: This project includes the construction of a new boiler building on the site of the VA West Haven campus, which is further denoted as Building #18 in the project plans. The new building will be constructed immediately west of the existing Boiler building, denoted as Building #19 on the project plans. A level of internal renovations will also occur at the existing Building #19. Architectural and mechanical process
requirements dictate that the finish grade for new construction at Building #18 matches finish grade of existing Building #19 to maximize use in the building footprint. This will require extensive site work to locate the new building; most notably, this includes removing 6-8 feet of grade on the north side of the proposed building, which will interrupt existing utilities and likely require ledge removal. Related additional site work includes rerouting existing pedestrian walkways; reconstructing site vehicle access; and adding new grade-level vehicular access for Building #18. Siting Building #18 also requires demolishing the existing Building #22A and a separate generator on campus and reconstructing this function as Building #18A. Site work will also include utility construction to replace existing utility uses disrupted by construction and provide function to the new construction. The project will be constructed following the construction of a new chiller plant facility, and as such a level of critical phasing has been considered in the design of this project. PROCUREMENT INFORMATION: The proposed project will be a competitive, firm-fixed-price contract utilizing the design-bid-build approach (Final Specifications and Drawings will be provided). The anticipated solicitation will be issued either as a Request For Proposal (RFP) in accordance with FAR Part 15, considering Technical and Price Factors or as an Invitation for Bid (IFB) in accordance with FAR Part 14, considering Price only. The results and analysis of the market research will finalize the determination of the procurement method. The type of socio-economic set-aside, if any, will depend upon the responses to this notice and any other information gathered during the market research process. This project is planned for advertising in 4th quarter of FY 26. In accordance with VAAR 836.204, the magnitude of construction is between $50,000,000.00 and $100,000,000.00 (Note that the VAAR magnitude of construction is closer to the lower end of this range). The North American Industry System (NAICS) code 236220 (size standard $45.0 million) applies to this procurement. The duration of the project is currently estimated at 720 calendar days from the issuance of a Notice to Proceed. The services for this project will include providing all construction related services such as: providing labor, materials and equipment required to complete the project as per contract documents prepared by an independent Architect-Engineer firm. CAPABILITY STATEMENT: Respondents shall provide a general capabilities statement to include the following information: Section 1: Provide company name, Unique Entity Identifier (UEI), company address, Point-of-Contact name, phone number and email. Section 2: Provide company business size based on NAICS code 236220. Also, provide business type (i.e., Large Business, Small Business, Service-Disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-Owned Small Business, Hub Zone Small Business, etc.). Section 3: Provide a Statement of Interest in the project. Section 4: Provide the prime contractor s available bonding capacity in the form of a letter of intent from your bonding company with this submission. Please ensure that the individual bonding capacity is in line with the VAAR Magnitude of Construction listed above. Section 5: Provide the type of work your company has performed in the past in support of the same or similar requirement. This section is IMPORTANT as it will help to determine the type of socio-economic set-aside, if any. Please provide the following in your response: No more than three (3) contracts that your company has performed within the last seven (7) years that are of comparable size, complexity, and scope to this requirement. Include the project name, project owner and as this person may be contacted for further information, project scope, project size (Example: square footage), building use (Example: Medical Facility, etc.), project dollar value, start and completion dates. Provide specific examples that relate aspects of previous projects to the proposed project. Describe specific technical skills and
key personnel your company possess to perform the
requirements described under description of work. Describe your Self-Performed effort (as either a Prime or Subcontractor). Describe Self-Performed work in terms of dollar value and description. Self-Performed means work performed by the offeror themselves, NOT work performed by another company for them for any of the project examples provided. Section 6: Project Labor Agreement (PLA) - A PLA is defined as a pre-hire Collective Bargaining Agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). The PLA questionnaire must be filled out and returned with the Sources Sought response. The questionnaire can be found at the end of this document. In accordance with Federal Acquisition Regulation (FAR) 22.5 - Labor Agreements for Federal Construction Projects, Policy:
Point of Contact: Doniver G. Hamilton Contract Specialist [email protected] PROJECT LABOR AGREEMENT (PLA) QUESTIONNAIRE (Please respond to the