The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring power supply units, specifically a 6KVA power unit and additional power supplies, with a total quantity of 6 units. The procurement requires firm fixed price quotes and includes government source inspection.
The contractor is required to manufacture and supply a 6KVA power unit along with additional power supplies, ensuring compliance with government inspection requirements.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov|4|N7M1.8|HSA|1 (771) 229-0412|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|To Be Determine (TBD)|N00104|(TBD)|(TBD)|SEE SCHEDULE|(TBD)|||(TBD)|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| LIMITATION OF GOVERNMENT LIABILITY (APR 1984)|2|(TBD)|NOT TO EXCEED THE OBLIGATED AMOUNT| PAYMENT BY ELECTRONIC FUNDS TRANSFER--OTHER THAN SYSTEM FOR AWARD MANAGEMENT (JUL 2013))|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|333996|1,250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Please provide a FFP quote at your earliest convenience (15 days maximum) forthe following buy: NSN: 3HD 9999 LLCYD1745 NOM: POWER UNIT,6KVA P/N: 836-01AY QTY: 1 NSN: 7HH 6120 200123218 NOM: POWER SUPPLY P/N: 841-01-14 QTY: 5 All freight is FOB Origin. This RFQ is for a buy. The resultant award of this solicitation will be issuedbilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. Government source inspection is required. - Unit Price:__________ FIRM - Total Price:__________ FIRM - Procurement Turnaround Time (PTAT) :__________ - Awardee CAGE: __________ - Inspection & Acceptance CAGE, if not at source:__________ - Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________ Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide a letter/official email from the OEM confirming your company is authorized an authorized distributor of their items. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture and the contract quality
requirements for the POWER UNIT,6KVA . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3.
REQUIREMENTS 3.1 Cage Code/Reference Number Items - The POWER UNIT,6KVA furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;38370 836-01AY; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N,
16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH
Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement
Get matched to contracts like this daily
Free AI-powered contract matching for your business.