Maintenance of Pedestrian Doors and Vehicle Gates Systems

State DepartmentSol: 19AU9026Q0013
FFP
est. $48K – $829K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of State is procuring maintenance services for pedestrian doors and vehicle gates at the U.S. Tri-Mission in Vienna. The contractor will be responsible for inspections, maintenance, and repairs to ensure the safe operation of all door and gate systems, including compliance with various safety standards. A written service report is required after each visit, and the contract will be awarded to the lowest priced acceptable offer.

Generated 30d ago

Scope & Requirements

The contractor will perform systematic inspections and maintenance of door and gate systems, ensuring compliance with safety regulations and operational efficiency.

Deliverables

  • Written service report after each visit
  • Draft report left with the Embassy
  • Final report sent to Facilities/FAC, COR via e-mail within two weeks after service

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Typei
FFP
Estimated Value
est. $48K – $829K
Place of Performance
Vienna, Austria

Agency & Contact

Contracting Organization

Agency
STATE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 23, 2026
Became Solicitation1mo ago
Jun 23, 2026
Tracked
Last Updated29d ago
Jun 25, 2026
Response Due16d ago
Jul 8, 2026
Anticipated Award Datein 4d
Jul 29, 2026

Description

This project is for the maintenance of all 14 door and gate systems at the properties of the U.S. Tri-Mission, Vienna. It covers all required inspection and maintenance services to ensure the safe and uninterrupted operation of the systems on a permanent basis. In accordance to this

scope of work, Contractor shall furnish all labor, materials, supervision, equipment, insurance, taxes, overhead and all things and services necessary to complete the work required. The contractor performs systematical inspections and services of doors and gates considering ÖNORM B 1205, EN 13241-1 and supplies regulations (Arbeitsmittelverordnung) respectively DIN EN 12604, 12453, 12445, 12635 and vendor-specific specifications. The contractor, as a specialized company, checks, cleans and maintains (smudges), all existing or newly delivered, fixed (static), movable (dynamic), mechanical, electrical, electromechanical, hydraulic and electronic components and safety related components. The work involve, but is not limited to: - Examine for function, damages and adjustment of the entire system including safety equipment - Adjusting and cleaning the surfaces and lubricate sliding surfaces - Check the correct motion and control processes - Entry of the results into a test log - Preferential treatment at malfunctions - Check the leafs and leaf-fills including associated sealing, hinges, hangers, wicket doors, e.g. for its condition, fixing and wear as well as corrosion - Check the drive motor for mounting/ corrosion and check the cage for leaks - Check condition of electrical wiring and connections, the protection of the piston and the oil quality - Functional testing and adjustment of the braking effect, of the emergency release for manual operation and the limit switch - Functional testing of switchgear, control and safety devices and adjusting them - Status and function tests of the equipment for securing of pinching and shearing points such as pressure sensitive pumpers, force limiters (measurement), dead mans control, contactlessly acting safety equipment and covers - Check the safety distances between the movable door leafs and fixed parts of the environment - Hinges, cone and cup assembly, locks, drive mechanism need to be cleaned of dirt and paint, adjusted, lubricate and make it perfectly easily movable - Supervise of the oil level within the drive of the drive mechanism - Testing and cleaning of the stearing unit and controller - Sustainable cleaning of the named components of dirt origination from every day operation The Contractor must provide a written service report for each visit – a draft should be left with the Embassy - at the time of the service and a final report sent to Facilities/FAC, COR via e-mail within two weeks after the date of service. All responsible sources may submit a quotation which will be considered. For a quotation to be considered, you must also complete and submit the following: 1. SF-1449 2. Section I,

Pricing 3. Additional information as required in Section 3 of the solicitation document 4. Proof of SAM Registration For additional information, soliciation documents and/or technical specifications please contact: [email protected]. The U.S. Government intends to award a contract to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so. Anticipated award date July 29, 2026 Zahid Raja Alternative

Point of Contact Norbert Tritscher Contracting , 2201 C ST NW (No Street Address

2) WASHINGTON, DC 20520 USA to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.