Closed
Save

Peterson Air Force Base Air Handling Unit Repair

Department of Defense (DoD) > U.S. Air Force
est. $13K – $34K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring repair services for an air handling unit (AHU) at Peterson SFB, specifically refurbishing components and ensuring proper airflow and vibration control. Key requirements include submitting a Gantt chart for the work schedule and conducting various tests to meet manufacturer's specifications.

Generated 55d ago

Scope & Requirements

The contractor will refurbish the air handling unit at Building 1171, including the repair and replacement of components, ensuring proper airflow, and conducting necessary tests.

Deliverables

  • Gantt chart schedule
  • Airflow test results
  • Vibration control measures

Contract Details

Estimated Value
est. $13K – $34K
Similar contracts award $13K$126K (median $35K, 14,862 awards)Within typical range
NAICS Codes
Place of Performance
PETERSON SFB, CO, USA

Qualifications & Eligibility

Set-Aside Category
NT/REPAIR/REBUILD OF EQUIPMENT

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 9, 2026
Last Updated2mo ago
Apr 9, 2026
Became Award Notice2mo ago
Apr 9, 2026
Tracked
Became Solicitation2mo ago
Apr 9, 2026
Tracked
Response Due1mo ago
Apr 27, 2026

Description

Project is to refurbish air handling unit (AHU) at Building 1171. To accomplish this several AHU components will need to be repaired/replaced. Work schedule shall be clearly delineated in a Gantt chart schedule with the dates submitted to the Government for review and approval. Existing Unit: Trane, s/n U3A26715. Contractor shall remove and replace all fan bearings as well as fan shaft. There should be no vibration, and a static air pressure test shall be conducted to ensure manufacturer's specification cubic feet per minute are being produced at supply air trunk. Contractor shall startup system to ensure existing AHU with Variable Frequency Drive. Contractor shall test the airflow to verify flows match original design. Contractor shall make sure that the loop remains free of air bubbles when filling the coil with water. Contractor shall test and balance the airflow to match original design airflow to conditioned areas. Replace fan shaft with original manufacturer size shaft and install new supports to mitigate vibration of the shaft. Stephen Hayden Alternative

Point of Contact Karen Grinder Contracting -556-4230 135 DOVER STREET STE 1055 PETERSON SFB, CO 80914-1117 USA to this opportunity. Solicitation - FA251726Q0024.pdf Statement of Work.pdf Site Visit Info and Instructions.pdf

Instructions to Offerors.pdf Evaluation Factors for Award.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.