The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring globe valves for the Defense Logistics Agency, specifically for DLA Maritime Mechanicsburg. This requirement is a 100% Small Business Set-Aside, and vendors must provide a surplus material certificate if applicable.
The work involves the procurement of globe valves, which requires compliance with specific quality standards and submission of necessary documentation.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov(JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report||TBD|SPRMM1|TBD|TBD|TBD|TBD|TBD|TBD|TBD|||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|x|x|x|||x|||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| For the purpose of this amendment is to extend the delivery dates for quotes.Due date is hereby changed from FEB 17th 2026 to FEB 27th 2026. This requirement is being solicited as a 100% Small Business Set-Aside (SBSA) .1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement areconsidered to be "issued" by the government when copies are either deposited inthe mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. 2. No drawings or technical data are available for this item. 3. RFID is only required if the Ship To code identified above is listed at thewebsite with DFARS 252.211-7006 PASSIVE RFID, at the time of shipment.Currently, there are no locations listed that require passive RFID tagging. 4. Delivery days_________aro. 5. Offer valid for _____ days. 6. Notice to surplus/new surplus/new manufactured surplus suppliers: Submission of your quote without a surplus certificate will null and void yourquote. A surplus material certificate must accompany all quotes for surplus/newsurplus/new manufactured. If submitting quote via EDI, a faxed or scannedcopy must be sent to the buyer. 7. When submitting quotes via EDI, make sure you specify any exceptions (i.e.Mil specs/standards, packaging, I&A, packaging houses etc) or follow up with ahardcopy of the exceptions. If nothing is indicated or received, award will bebased upon solicitation
requirements. Changes or requests for changesafter award will have consideration costs deducted on modifications. 8. If supplies will be packaged at a location different from the offeror address, the offeror shall provide the name and street address of the packagingfacility. Inspection of material will be at: (CAGE CODE) ______________________________________________________________ Inspection of packaging and final acceptance of material will be at: (CAGECODE) ______________________________________________________________ 9. If you are not the manufacturer of the material you are offering, you muststate who the OEM is (CAGE code) and the part number you are offering. 10. Please provide an email address for follow up communications. ____________________________________________________________ It is recommended that vendors provide to NAVSUP WSSMechanicsburg in order to receive automated notifications from Navy ElectronicCommerce Online (NECO) when contracts/modifications are issued by DLA MaritimeMechanicsburg and posted on EDA. To receive these notifications, contact:NAVSUPWSS code 025, procurement systems design and contract support divisionVia email at [email protected]. Please include the followinginformation with your request: CAGE code, company name, address and POC withphone number and email address. Contractors can view their orders, contracts, and modifications at theElectronic Document Access (EDA) web tool. This web tool is located at theProcurement Integrated Enterprise Environment (PIEE) website. It is recommendedthat the contractor register for EDA at https://piee.eb.mil Click on new user and registration. Any order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF. 11. Requesting quotes be valid no less than 60 days. This procurement requires Higher Level Inspection. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture and the contract quality
requirements for the VALVE,GLOBE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-STD-129 | | |R |190927|A| |02| DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | 3.
REQUIREMENTS 3.1 Cage Code/Reference Number Items - The VALVE,GLOBE furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;99565 380-5PLD8183; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC
Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the
Get matched to contracts like this daily
Free AI-powered contract matching for your business.