The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring fuel cells for the Defense Logistics Agency, specifically for use in aircraft accessories and components. Key requirements include maintaining a quality control system and providing newly manufactured spares only, as refurbished or remanufactured items are not acceptable.
The contractor is responsible for providing fuel cells, ensuring compliance with specific quality control standards, and conducting all necessary inspections.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov(JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||x|AS/EN/JISQ 9100 or equivalent ||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Invoice 2in1|TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD|TBD|TBD|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS |45 DAYS AFTER DISCOVERY OF DEFECT ||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||| For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification oCritical Safety Items, is incorporated by reference. Procurement Note E05 (DLAD 46.492) is hereby incorporated by reference. As applicable DFARS clause 252.242-7005, Contractor Business Systems, isincorporated by reference. THIS SOLICITATION IS BEING ISSUED UNDER EAF AUTHORITY; Synopsis is waivedbased on urgency (FAR 5.202(a)(2)). This is a Critical Safety Item (CSI). Unless for (P-8/P-3 Platform) Commercial Items (IAW FAR 2.101) readilyavailable on the commcercial market for which current FAA certificationdocumentation (FAA Form 8130-3 Air Worthiness Approval Tag) will accompanyindividual product, for New Unused stock from the OEM, Offerors are advisedthat offers received from sources which are not Government-approved sources ofsupply will be deemed technically unacceptable, and therefore ineligible foraward. Any distributors of approved source(s) MUST submit a copy of theirauthorized distributor letter, on the source's letterhead, to the point ofcontact indicated on the soliciation via email, at time of proposal submitted. Other than what is noted for P-8/P-3 Platform, all potential offers shallprovide newly manufactured spares only. Refurbished, remanufactured, orrepaired material will not be acceptable; Offers for such are ineligible for for award. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3.
REQUIREMENTS The contractor shall maintain a quality control system which meets the
requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection
requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection
requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the
requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual
Get matched to contracts like this daily
Free AI-powered contract matching for your business.