The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.
Get your fit score, win probability, and required capabilities.
DCMR Driveway and Stormwater Drainage Rehabilitation. Work includes stormwater drainage investigation, repair, and upgrade; full removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness); subgrade and base course rehabilitation; replacement of existing stone edging with 150 mm concrete kerbs; entrance apron asphalt works; and full site restoration of landscaping, irrigation, lighting, and utilities. The contractor shall furnish all labor, materials, equipment, and miscellaneous costs required to complete the installation as specified herein.. Please refer to Section B for the detailed Statement of Work. Malenereynee Carr Alternative
Point of Contact Paul Rau Contracting , 2201 C ST NW (No Street Address
2) WASHINGTON, DC 20520 USA to this opportunity. RFQ 19AS2026Q0020 DCMR Driveway and Stormwater Drainage Rehabilitation.pdf Attachment 1.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.