|4|N743.43|WWJ|717-605-3992|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION (JUN 2002)|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001|30|PCO LISTED ON PAGE 1||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|335311|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on
27 May 2026. Small Business Set Aside was dissolved. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (450 days) FAT REPORT 180 DAYS AFTER APPROVAL OF PRLT APPROVAL OF FAT REPORT 60 DAYS AFTER RECEIPT \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Switch Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability
requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=5486638 |53711| H| |D|0001 | H|49998|0329168 DRAWING DATA=5486639 |53711| W| |D|0001 | W|49998|3053606 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-DTL-24231 |0013| |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | DOCUMENT REF DATA=S9320-AM-PRO-030/MLDG | | |3 |050201|A| | | 3.
REQUIREMENTS 3.1 ;The Switch Cable Assembly must be manufactured in accordance with NAVSEA drawing 5486638, consisting of Item 14B and Item 65 as shown in Wiring Diagram Detail "A", except as amplified or modified herein.; 3.2 ;Drawing 1853078 does not apply.; 3.3 Prior to molding, MIL-DTL-24231 connector plug bodies must be treated with a Non-Conductive Coating (NCC) plasma spray in accordance with NAVSEA S9320-AM-PRO-030/MLDG by an approved vendor listed in CSD024 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.4.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.5 Quality Conformance Tests - Each Cable assembly must be subjected to Quality conformance tests per MIL-DTL-24231 Type 1 with the following exceptions: (Certificate of Compliance only) A) The hydrostatic pressure test must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231 at ;135; +5%/-0% PSI for both the three cycle test and 2 hour test. B) The Insulation resistance check must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231. C) A dielectric test is required per SS800-AG-MAN-010/P-9290 paragraph 3.6.3.5 Electrical Testing and MIL-DTL-24231 at ;500; V AC. 3.6 First Article Test (Contractor): One complete Cable assembly must be subjected to First Article Tests per MIL-DTL-24231 type 1 and the following: A) The hydrostatic pressure test must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231 at ;135; PSI. B) The Insulation resistance check must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231. C) A dielectric test is required per SS800-AG-MAN-010/P-9290 paragraph 3.6.3.5 Electrical Testing and MIL-DTL-24231 at ;500; V AC. 3.7 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.9 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.9.1 Waivers/Deviations - All waivers and deviations, regardless of significance or require review and approval by the
Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.9.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.9.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.9.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.10 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the
requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE