Closed
Save

Heavy Hex Nut for Naval Weapon Systems

Department of Defense (DoD) > U.S. Navy > NAVSUP WSS Mechanicsburg
est. $37K – $350K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring heavy hexagon nuts for use in crucial shipboard systems. The contract is a total small business set-aside, with past performance considered in the evaluation.

Generated 57d ago

Scope & Requirements

The material covered in this contract/purchase order will be used in a crucial shipboard system, requiring special control procedures to ensure receipt of correct material.

Deliverables

  • Submission of Certification Data CDRLs
  • PNSY review/acceptance of Certification CDRLs
  • Final delivery of material

Evaluation Criteria

  1. Past Performance

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Estimated Value
est. $37K – $350K
Similar contracts award $59$2K (median $307, 313,474 awards)Above typical range
NAICS Codes
Place of Performance
Mechanicsburg, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside
Past Performance
Past performance will be considered in the evaluation of offers.

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Department of the Navy
Office
NAVSUP WSS Mechanicsburg

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 2, 2026
Last Updated3mo ago
Mar 2, 2026
Became Presolicitation3mo ago
Mar 2, 2026
Tracked
Response Due3mo ago
Mar 13, 2026
Closing Date2mo ago
Mar 23, 2026
Final Delivery of Materialin 10mo
Mar 23, 2027
365 days after effective date of the resulting contract

Description

|4|N743.6|WVX|564-230-3066|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|0001|65||||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2|N/A|N/A|S4306A - Material|N/A|N/A|SEE DD FORM 1423 |[email protected] | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332722|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Soliciation is hereby amended to extend closing to 23MAR2026. \ 1. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" - rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with FAR 13.106(a)(2) and DFARS 252.213-7000. 6. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.1.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=ANSI/ASQ-Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3.

REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the

requirements as specified in MIL-DTL-1222, except as amplified or modified herein. MIL-DTL-1222 ordering data information is provided below.

  • (a) Studs, bolts, hex cap screws, socket head cap screws, and nuts; MIL-DTL-1222.
  • (b) Part Number - ;N/A; Configuration - ;NUT; Type - ;III; Style - ;N/A; Grade - ;400 OR 405 (QQ-N-281); Condition - ;As formed or Stress Relieved; Size - ;1 1/2 inches; Length - ;N/A; Thread Series - ;8 UN; Class of Fit - ;3B; End Configuration - ;N/A;
  • (c) Issue of DoDISS is specified elsewhere in the Contract/Purchase Order.
  • (d) Heat Treatment must be performed in accordance with applicable specifications.
  • (e) Type of Coating - ;N/A;
  • (f) Aluminum alloy fasteners must be coated in accordance with MIL-DTL-1222, unless otherwise specified in paragraph
  • (e) above.
  • (g) Externally threaded titanium alloy fasteners must be anodized in accordance with MIL-DTL-1222, unless otherwise specified in paragraph
  • (e) above.
  • (h) Cut or ground threads ;are permitted; .
  • (i) See ordering data item
  • (b) above as applicable.
  • (j) Bearing Surfaces - ;Chamfered or Washer Faced;
  • (k) Self-Locking element - ;N/A;
  • (l) Marking must be as specified in paragraph 3.13 of MIL-DTL-1222.
  • (m) Chemical, Mechanical, and Non-Destructive test results must be as specified elsewhere in this Contract/Purchase Order.
  • (n) Resubmittal of fastener lots that failed an examination is not allowed unless specifically approved by the PCO.
  • (o) Retesting of mechanical properties is not allowed unless specifically approved by the PCO.
  • (p) Rework and resubmittal of lots must be in accordance with MIL-DTL-1222.
  • (q) Inspection of defects must be in accordance with MIL-DTL-1222, unless otherwise specified elsewhere in this Contract/Purchase Order.
  • (r) Acceptance criteria for inspection of defects must be in accordance with MIL-DTL-1222, unless otherwise specified in this Contract/Purchase Order. (S) Non-Destructive Testing must be in accordance with MIL-DTL-1222, unless otherwise specified elsewhere in this Contract/Purchase Order.
  • (t) Mechanical testing must be performed after final heat treatment, unless otherwise specified elsewhere in this Contract/Purchase Order.
  • (u) Preservation, packaging, and packing

requirements must be as specified elsewhere in the contract/purchase order. (v) - (bb) Substituting material grades is not allowed unless specifically approved by the PCO. 3.2 The Unit of Issue is EACH. The Contractor is required to provide one additional fastener for each uniquely identified heat/lot of material in each shipment. Complete traceability must be maintained on this extra fastener. 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below. Test - ;Liquid Penetrant Inspection; Item - ;Nut, Heavy Hexagon; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 3.4 Specification Change - For QQ-N-281, Class B material: 1 - Footnote 9 to Table II of QQ-N-281 does not apply. 2 - When starting material is Round Bar greater than 3" dia, the mechanical properties of Hex Bar apply. 3.5 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.6 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.6.1 Waivers/Deviations - All waivers and deviations, regardless of significance or require review and approval by the

Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.6.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.6.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.7 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the

Get matched to contracts like this daily

Free AI-powered contract matching for your business.