Argon Piping Supply, Installation, And Testing Services

Dept. of Energy
est. $24K – $298K
Quick Brief

The Department of Energy is procuring the supply, installation, and testing of a stainless-steel pipeline for transporting Argon as part of the DUNE experiment. The project involves transporting approximately 40,000 metric tons of Argon from the surface to the Central Utility Cavern, requiring specific pipeline dimensions and configurations. Key requirements include the construction of an 8-inch and 6-inch diameter pipeline to facilitate the conversion and transportation of Argon in both liquid and gaseous forms.

Generated 5d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Estimated Value
est. $24K – $298K
Similar contracts award $24K to $298K (median $80K, 2,149 awards)Within typical range
NAICS Codes
Place of Performance
Batavia, IL, USA

Agency & Contact

Contracting Organization

Agency
ENERGY, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Amendment 1 Issued16d ago
Jul 8, 2026
Published7d ago
Jul 17, 2026
Last Updated7d ago
Jul 17, 2026
Amendment 2 Issued7d ago
Jul 17, 2026
Became Solicitation6d ago
Jul 17, 2026
Tracked
Response Dueyesterday
Jul 23, 2026
Proposal Due Datein 3d
Jul 27, 2026

Description

July 17, 2026 - Amendment 2 is issued to proviide additional

questions and answers to this RFP. Documents are attached. The Proposal due date is unchanged, proposals are due on 27 July 26. July 8, 2026 - Amendment 1 is issued to provide

questions and answers to the RFP. Documents are contented in the attached link. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the

requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above. Jerry King Alternative

Point of Contact Susan Underwood Contracting . & Pine St. (No Street Address

2) Batavia, IL 60510 USA