Closed
Save

Stephenson Taylor Water Line Extension Project

Health & Human Services (HHS)Sol: 75H70126R00038
ISBEE
$250K – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Value
$250K – $45M
Set-Asides
ISBEE

Agency & Contact

Contracting Organization

Agency
HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published23d ago
Jul 2, 2026
Became Special Notice22d ago
Jul 2, 2026
Tracked
Last Updated21d ago
Jul 4, 2026
Response Due5d ago
Jul 19, 2026

Description

This is a PRESOLICITATION NOTICE for the upcoming Solicitation 75H701-26-R-00038 Stephenson-Taylor Water Line Extension a construction project prepared in accordance with FAR Part 36. These construction services are in support of the Indian Health Service (IHS). The Government anticipates releasing the solicitation on or about

19 July 2026 and will remain open for approximately 30 calendar days. The solicitation and all amendments for this Request for Proposals will be posted on https://sam.gov under Contract Opportunities. A full

scope of work, plans and specifications and Construction Wage Determination will be included in the solicitation documents. Additional details can be found in the solicitation when it is posted to https://sam.gov.

SCOPE OF WORK: This acquisition is to obtain all required commercial services, equipment, materials, and supplies to construct a water line extension for Caddo County Rural Water District No. 3. Furnish and install 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE as casing. Directional Bore 815 feet total including 2 road crossings, 1 driveway crossing, and 1 creek crossing. 2 open cut gravel road crossings totaling 55 feet. Case the water main or maintain a 5-foot horizontal and 2-foot vertical separation requirement from all gas lines. Furnish and install 4 water main taps, water meters, and water service lines to homes. This includes 400 feet of 1-inch PE and 870 feet of 1.5-inch PE and appurtenances. Furnish and install appurtenances including all gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings. Complete pressure testing and provide results to the project engineer. Satisfactorily complete disinfection and bacteriological testing of completed water main. Provide results to the project engineer. 2 consecutive negative tests 24hrs apart. Re-sampling of positive tests is to be performed at contractor expense. Connect installed water line extension to Caddo County Rural Water District No. 3. LOCATION OF PROJECT: All work shall be performed at three sites in Binger, Oklahoma.

PERIOD OF PERFORMANCE

Period of Performance is 90 calendar days from date of notice of proceed. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000 and $500,000. SITE VISIT: Details regarding the Site Visit will be included in the solicitation.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.