The United States Section of the International Boundary and Water Commission is procuring the design and construction of an emergency generator and building for the Retamal Dam. The project includes site preparation, inspection of all systems, and quality control testing, with specific working hours and access requirements for contractors. A warranty of at least five years for the generator and automatic transfer switch is required, along with 20 years for roofing materials.
The work involves the design and construction of an emergency generator and building at Retamal Dam, including site preparation and quality control testing.
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the complete the Design-Build of Retamal Dam Emergency Generator and Building. The emergency generator at Retamal Dam is no longer working and rreplacment is necessary. The new generator will be housed in a metal building installed on a new concrete pad with a modern diesel fuel tank. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing. The working hours of the USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work on site during these proposed hours. USIBWC facilities, including the dam, are closed during all federal Holidays. Workers must pass though USIBWC levees to access Retamal Dam. Boarder Patrol are present in the area. Contractor and subcontractor shall have identifying vehicular when working in the area. US Fish and Wildlife own land adjacent to Retamal Dam. Contractor shall stay clear of US Fish and Wildlife property. A site visit date is listed in the Solicitation. A completed Form 358 is also required prior to attendance at the prebid site visit. Section 01.78.36 requires a warranty of at least 5 years for Generator and Automatic Transfer Switch. 20 years for shingles/Roofing and Roof system. This Solicitation will be issued pursuant to FAR Part 14. All responsible sources must submit a bid to be considered by the Agency. Adrian Knights Alternative
Point of Contact Philip Johnson Contracting . Mesa (No Street Address
2) El Paso, TX 79902 USA to this opportunity. Existing Utilities As Built.PDF Qs and As.docx IBWC 110 Certification of Authority for Signing Bids.pdf IBWC 116 Stmt of Equipment.pdf IBWC 117 Pre-Bid Conference Attendence.pdf Retamal Dam Generator DB Specs Final 326.pdf IBWC Form 245A Minimum Quals for Award Joint Venture.pdf IBWC Form 245 Minimum Qualifications for Award.pdf IBWC Form 245B Backup Information.pdf Wage Determination.pdf 191BWC26R0005.pdf IBWC Form 358 Nondisclosure Agreement SBU.pdf