Conduct Substation Upgrade with Two 6000 kVA Transformer Replacements

Veterans Affairs (VA) > NETWORK CONTRACT OFFICE 23 (36C263)
SDVOSB
est. $5.0M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Veterans Affairs is procuring services for the upgrade of a substation, which includes the removal and replacement of large and medium voltage transformers, installation of anti-ram rated bollards, and various construction tasks. The project is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).

Generated 61d ago

Scope & Requirements

The contractor will perform the removal and replacement of transformers, installation of bollards, and other construction activities as specified in the contract documents.

Contract Details

Estimated Value
est. $5.0M – $45M
Similar contracts award $13K$136K (median $40K, 9,578 awards)Above typical range
Period of Performance
2026-05-01T10:00:00-05:00
NAICS Codes
Set-Asides
SDVOSB

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-Agency
VETERANS AFFAIRS, DEPARTMENT OF
Office
NETWORK CONTRACT OFFICE 23 (36C263)

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 4, 2026
Last Updated3mo ago
Mar 4, 2026
Became Solicitation3mo ago
Mar 4, 2026
Tracked
Response Due3mo ago
Mar 18, 2026
Response Date1mo ago
May 1, 202610:00 AM

Description

The Contractor shall furnish all labor, materials, tools and equipment required to: Remove and replace two large 5000KVA utility grade transformers with two 6000 KVA utility grade transformers. Remove and replace a total of 16 smaller medium voltage transformers in the range of 30 KVA to 750 KVA. Provide passive, anti-ram rated bollards in accordance with ASTM F2656 crash rating

requirements (minimum M30/P1 or as directed by VA), installed per Specification Section 34 71 13. Bollards shall be placed a minimum of 3 feet from transformer pads, spaced no more than 5 feet apart, and removable where located within electrical working clearances, designed per project drawings. Replace transformer pads, where required, with new pads meeting 4000 psi concrete strength and reinforcement per EK501 detail in the drawings. All work completed in accordance with the specifications and contract drawings. Work includes, but is not limited to: Demolition and removal of items noted in the Contract Documents including but not limited to existing transformers and concrete as required. Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. No asbestos and/or lead finds are anticipated. Electrical, Landscape, Site Concrete are trades expected to be needed as part of this project. Contractor to furnish all equipment. New construction consists of but is not limited to: Substation area and the vicinity of each transformer being replaced. Provide anti-ram rated bollards.POP 886 Dwayne Brauch to this opportunity.