The U.S. Army Corps of Engineers is procuring the replacement of the Gantry Crane Machinery Housing Roof at Conemaugh Dam. This project involves the removal of existing housing, fabrication and installation of new steel housing, and upgrades to flooring and electrical systems to prevent water damage and vermin intrusion. The contract is set aside for small businesses and will be awarded as a Firm-Fixed Price contract with a performance period of 540 days.
Get your fit score, win probability, and required capabilities.
The project involves the construction and installation of new steel upper machinery housings for Gantry Crane hoists, including necessary electrical and flooring upgrades.
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, has a project to provide new steel upper machinery housings for the Gantry Crane hoists at Conemaugh Lake. Construction includes removal of existing housing to floor line, fabrication and installation of new housing (steel fabrication), removal of portions of steel diamond plate flooring and replacement with open grating, installation of floor hatches for access by personnel and access to the limit switches and replacement of electrical conduit, wiring and lighting. The upper machinery houses for the main hoists on the Gantry Cranes at Conemaugh Dam are extensively corroded and exhibit heavy loss on the housing steel (supports and steel plate cladding). The deterioration of the housing is allowing water to affect the hoist electrical and mechanical equipment. The flooring and access hatches are obsolete and allow vermin to habit within the housing which causes impacts to access the limit switches. The North American Industrial Code (NAICS) is 237990 ? Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. This procurement is a 100% Small Business Set-Aside. All interested and capable Bidders are encouraged to Bid. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Contract. All responsible Bidders are encouraged to submit a Bid. The
Period of Performance (POP) is 540 Calendar Days after written Notice to Proceed (NTP). Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?. Mario TAORMINA Alternative
Point of Contact Connie L. Ferguson
Get matched to contracts like this daily
Free AI-powered contract matching for your business.