ActiveSources Sought
Save

Repair Fire Sprinkler System at Facility 128 in Vance Air Force Base, Oklahoma

Department of Defense (DoD)Sol: XTLF25-1019

This is a Sources Sought notice

The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.

Can you respond to this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Value

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published24d ago
May 11, 2026
Became Sources Sought23d ago
May 11, 2026
Tracked
Last Updated22d ago
May 13, 2026
Response Duein 15d
Jun 18, 2026

Description

ASRC Federal Gulf State Constructors (AFGSC), as Prime Contractor to the United States Government, hereby solicits quotes from qualified firms for the following Firm-Fixed-Price requirement. Important Funding Notice: This requirement is unfunded at this time. Neither AFGSC nor the Government is obligated to award or reimburse proposal costs. Award will only occur when/if funding becomes available. AFGSC or the Government may cancel this solicitation at any time before or after the closing date. Description of Requirement: AFGSC requests Firm-Fixed-Price quotes to repair and replace the fire sprinkler system in Facility 128, Vance AFB, OK. Work includes, but is not limited to (Statement of Work is attached and in conjunction with this notice). • Full removal of the existing fire sprinkler system • Installation of two new wet-pipe fire sprinkler systems per NFPA 13 • Relocation of sprinkler risers to the designated mechanical room • Fire alarm interface work, including monitoring of valves, flow switches, and device tie-ins • Hydraulic calculations and a new water supply flow test • Installation of a new Fire Department Connection (FDC) • Installation of a new PIV valve, underground tie-ins, concrete repair, and required thrust blocking • Installation of new mains, branch lines, hangers, seismic bracing, and sprinkler heads • Installation of auxiliary drains, inspector's test connections, signage, and identification • System flushing, acceptance testing, hydrostatic testing, and final inspection • Delivery of as-builts, O&M manuals, warranties, and spare sprinklers All work shall comply with: • NFPA 13, 24, and 72 • UFC 3-600-01 • Specifications contained in the attached XTLF 25-1019 Repair Fire Sprinkler Specifications • Drawings in XTLF 25-1019 Repair Fire Sprinkler Drawings • AFGSC and Vance AFB

requirements. Contractor must field verify all dimensions and existing conditions.

Instructions to Offerors: Offerors must submit a complete quotation package including: 1. Firm-Fixed Price Proposal, using the attached bid sheet form and to include total cost for all labor, equipment, materials, testing, commissioning, and

deliverables. 2. Technical Submittals, including: • Proposed sprinkler system components (cut sheets, model numbers, listings) • Confirmation of NFPA 13/24 compliance • Draft schedule 3.

Key Personnel Qualifications: • NICET III Sprinkler Designer • Qualified installer with documented fire sprinkler experience • Quote Validity Certification through September 30, 2026. Email Quotes To: Betty Kliewer - [email protected] NLT June 18, 2026 at 1:00 PM CST Late quotes will not be evaluated or accepted.

Evaluation Criteria: This procurement will be awarded using Lowest Price Technically Acceptable (LPTA). Technical Acceptability Includes: • Conformance with all specifications and drawings • Correct licensing, NICET

Get matched to contracts like this daily

Free AI-powered contract matching for your business.