Closed
Save

Proposal Request for Rocket Missile Maintenance Facility at Letterkenny Army Depot

Department of Defense (DoD) > U.S. Army > Engineer Division North Atlantic
FFP
est. $4M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring construction services for the Rocket Missile Maintenance Facility at Letterkenny Army Depot, which includes the construction of a 45,000 square foot facility, a 10,000 square foot storage building, and a 1,600 square foot access control point. Key requirements involve site development, earthwork, and the installation of vehicle controls to support munitions operations and inspections.

Generated 30d ago

Scope & Requirements

The project involves the design and construction of a maintenance facility and access control point at Letterkenny Army Depot, including site development and infrastructure improvements.

Contract Details

Contract Typei
FFP
Estimated Value
est. $4M – $45M
Similar contracts award $25K$400K (median $99K, 73,582 awards)Above typical range
NAICS Codes
Place of Performance
Chambersburg, PA, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division North Atlantic

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 2, 2026
Last Updated2mo ago
Apr 2, 2026
Became Solicitation2mo ago
Apr 2, 2026
Tracked
Became Sources Sought2mo ago
Apr 2, 2026
Tracked
Response Due2mo ago
Apr 7, 2026

Description

Amendment 0002: Updates

Attachments H and I for accessibility.

Attachments H and I are updated and attached. In general terms, the project consists of a Design-Bid-Build acquisition strategy for construction services. Specific

requirements include: New construction of an approximate 45,000 SF Rocket and Missile Maintenance Facility (RMMF) warehouse and associated administrative support functions. Adjacent to the RMMF is an approximate 10,000 SF storage building and 1,000 SF forklift charging shed. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways and hardscape areas that support the loading and unloading of munitions. The project further includes the replacement of the existing Voelz Gate Access Control Point (ACP) and associated hardscapes. The new ACP includes an approximate 1,600 SF combined gatehouse, inbound/outbound lanes with commercial vehicle inspection canopies, and associated active and passive vehicle controls. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways, and hardscape areas that support the operations of the access control point and commercial vehicle inspections. Shawn Handley Alternative

Point of Contact Tonja Dreke

Get matched to contracts like this daily

Free AI-powered contract matching for your business.