Gavins Point Raw Water Intake Zebra Mussel Mitigation

Department of Defense (DoD) > U.S. Army > Engineer Division Northwestern District OmahaSol: W9128F26QA074
SB
$13K – $150K per task order
Quick Brief

The Department of Defense is procuring a zebra mussel mitigation system for the Gavins Point Raw Water Intake in Crofton, NE. The contractor will provide all labor, equipment, and materials necessary for the design and installation of the system, which includes local tank skids, pump skids, and interfacing with existing flow meters. The project has an estimated construction cost between $250,000 and $500,000 and is restricted to small businesses.

Generated 12d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The contractor will design and install a zebra mussel abatement system to protect the powerhouse raw water intakes and piping.

Contract Details

Contract Value
$13K – $150K per task order
IDIQ ceiling: $45M
Similar contracts award $13K to $150K (median $35K, 3,860 awards)
Period of Performance
210 days after receipt of Notice to Proceed
NAICS Codes
Place of Performance
Crofton, NE, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Small Business
NAICS Size Standard
$45M
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Northwestern District Omaha

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published14d ago
Jul 10, 2026
Became Solicitation13d ago
Jul 10, 2026
Tracked
Last Updated11d ago
Jul 12, 2026
Response Datein 3d
Jul 27, 202614:00
CDT
Response Duein 4d
Jul 27, 2026

Description

The contractor will supply all labor, equipment, and materials for installation of a new zebra mussel mitigation system. The scope of this project is to design a zebra mussel abatement system to protect the powerhouse raw water intakes and intake piping. The new design will utilize two small, local skids with spill containment near each raw water strainer within the powerhouse.Significant features of this design include:- Installation of two local tank skids and integral spill containment pallets- Installation of two pump skids for distribution? Power supply to distribution pumps and ancillary distribution system equipment- Interfacing of distribution pumps with the existing raw water flow metersThe Contractor will be required to commence work upon receipt of contract award and complete the work 210 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. Estimated Construction Costs:The estimated construction cost of this project is between $250,000 and $500,000. NAICS Code: The Primary North American Industry System (NAICS) code anticipated for solicitation is 237110, Water and Sewer Line and Related Structures Construction, with a size standard for Small Business of $45M.Obtaining Solicitation Documents: Solicitation documents will be posted to the web via SAM.gov (sam.gov). Find solicitation announcement in SAM.gov (sam.gov).1. Use the All Award Date to locate the project (by entering the solicitation number. 2. By using the login feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading . Contracting :USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901Point Of Contact: All

questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance).

Place of Performance:Gavins Point ProjectCrofton, NE 68730Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments. Brianna WOHLERS