Fort Buchanan Microgrid Project

Department of Defense (DoD) > U.S. Army > Engineer Division Great Lakes and Ohio River District LouisvilleSol: W912QR-26-R-A028
SBFFP
$15K – $364K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring a microgrid system for Fort Buchanan, which includes the installation of approximately 8 MW of diesel generators and a 4 MWh battery energy storage system. Key requirements involve constructing a microgrid control system, integrating existing energy sources, and ensuring energy resiliency through various electrical and structural installations. The project is set to last for 1,141 calendar days from the Notice to Proceed.

Generated 14d ago

Scope & Requirements

The project involves the design and construction of a microgrid system at Fort Buchanan, including the installation of diesel generators, battery storage, and a control system to enhance energy resiliency.

Contract Details

Contract Typei
FFP
Contract Value
$15K – $364K per task order
IDIQ ceiling: $45M
Similar contracts award $15K$364K (median $63K, 1,815 awards)
Period of Performance
1,141 calendar days
NAICS Codes
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
General Small Business
NAICS Size Standard
$45,000,000

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Great Lakes and Ohio River District Louisville

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published15d ago
May 20, 2026
Became Solicitation14d ago
May 20, 2026
Tracked
Last Updated14d ago
May 21, 2026
Response Due13d ago
May 22, 2026

Description

This is a Design-Bid-Build Construction project to provide an installation-level microgrid at Fort Buchanan consisting of approximately 8 MW of new diesel generators and 4 MWh battery energy storage system (BESS), as an option.

In addition, the project will install a microgrid control system including, but not limited to, paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying and fiber optic communication connections.

The project will install twelve 12,000-gallon above-ground, ballistic-resistant, diesel fuel tanks with a fuel polishing system to sustain critical operations continuously for 14 days.

The microgrid will include integration of existing large-scale onsite generation (4.65 MW from solar photovoltaic (PV) array and two 275 kW wind turbines).

The project also includes site work, start-up commissioning, interconnection agreement, assessment & authorization and all associated costs.

The microgrid system will support energy resiliency by providing on-site energy generation, this includes the installation of diesel generators, microgrid control system, electrical interconnection switchgear, interconnection circuit wirings, and modification to the existing electrical distribution system as necessary to establish the Fort Buchanan microgrid network.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.