The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring maintenance dredging services for the Naval Submarine Base Kings Bay in Camden County, Georgia. The work includes base dredging, bird monitoring, and options for additional dredging and mobilization. The project is set aside for small businesses with an estimated value between $10 million and $25 million.
The work includes maintenance dredging at specified locations, placement of dredged material, and options for additional dredging and mobilization.
THIS OPPORTUNITY IS AVAILABLE ONLY TOTHE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010:AGM Marine Contractors Inc. (W912EP25D0011); AHTNA Marine and Construction Company LLC (W912EP25D0012); Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013); Coastal Dredging Co., Inc. (W912EP25D0014); Cottrell Contracting Corporation (W912EP25D0015); Next Generation Logistics LLC. (W912EP25D0016); Southern Dredging Co, Inc. (W912EP25D0017); Southwind Corporation Corp. (W912EP25D0018); and Waterfront Property Servies LLC Gator Services (W912EP25D0019).A Pre-Bid Conference will be held via teleconference on
27 April 2026 @ 10:00AM, EDT.Please utilize the link and call information provided below:- LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING- Meeting ID: 993 325 182 157 / PASSCODE: 85YU3Wy3- DIAL IN BY PHONE: +1 503-207-9433 / PHONE CONFERENCE ID: 793 526 23#It is requested that an email be sent to [email protected] and [email protected] no later than
24 April 2026 at 1:00 PM, EDT to confirm attendance by your organization.DESCRIPTION OF WORK: Work is divided into a Base and three options as indicated below. For the base and dredging options, this contract incorporates two feet of allowable overdepth throughout.Base work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the
Contracting Officer. Additional Base work also includes bird monitoring and standby time.Option AWork consists of supplying additional field cut weir riser boards as requested by the
Contracting Officer.Option BWork consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the
Contracting Officer. Option B work also includes bird monitoring and standby time.Option CWork consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.The Request for Proposals (RFP) will be issued on or about
Get matched to contracts like this daily
Free AI-powered contract matching for your business.